KEY CONCEPT IDEA
The 5* Mixed Use Resort of 204 beds with FoH construction area of 19.700sq.m will be developed in a seaside plot of 109.000 sq.m. It comprises a hotel with spa facilities of Six Senses standards and twelve high-end villas varying from 800- 1.200 sq.m. The key concept idea was restoring the natural landscape, which was wholly altered to construct a hotel complex in the 1970s. On the restored hill, the new buildings will be in-caved constructions to minimize the environmental impact of the increased building coefficient due to the
role
Zoning, Land Use and Building Terms legal frame establishment Consultants, Masterplan and Architectural Concept Design Lead Consultants, Permitting Strategy and Permitting Procedures (In collaboration with Delogu Architects)
CLIENT
Taconic Capital, Cedar Capital, Golden Land Goutos, CBE Capital
STATUS
Currently under permitting completion. Demolition of pre-existing hotels and constructions to be finalized by the end of October 2024. Initiation of Construction Phase I, December 2024.